Name | Category | Final Depth (m) | RL Top (m)▼ | Latitude | Longitude | Location Method | Date Completed | Project | ||
---|---|---|---|---|---|---|---|---|---|---|
G4 | borehole | 17.50 | 4.200 | -27.47894872 | 153.0200732 | estimated-rough | 2005-06-03 | Southbank Educati... | file | |
AH19 | borehole | 4.95 | 4.190 | -27.56510124 | 152.9849952 | surveyed | 2015-05-25 | Ipswich Motorway ... | file | |
AH19-CPT | CPT | 19.90 | 4.180 | -27.56511012 | 152.9849769 | GPS | 2016-10-12 | Ipswich Motorway ... | file | |
BH2 | borehole | 13.10 | 4.180 | -27.08976309 | 152.97576277 | surveyed | 2005-11-07 | Widening of the C... | file | |
MAR-30 | CPT | 9.46 | 4.160 | -28.00446681 | 153.370073 | GPS | 2003-11-02 | Royal Pines | file | |
CRR737 | borehole | 11.31 | 4.160 | -27.43959446 | 153.0389157 | surveyed | 2017-09-21 | Cross River Rail | file | |
DH28 | borehole | 22.60 | 4.140 | -27.41133413 | 153.0774797 | estimated-rough | 1988-11-22 | Airport Drive Rou... | file | |
BH102 | borehole | 27.40 | 4.140 | -27.47378322 | 153.0184623 | estimated-rough | 1998-03-25 | South East Transi... | file | |
CRR738 | borehole | 10.00 | 4.140 | -27.4391907 | 153.0393255 | surveyed | 2017-10-27 | Cross River Rail | file | |
T-BH06 | borehole | 28.14 | 4.132 | -27.40467619 | 153.1653387 | GPS | 2016-09-16 | Port Drive Upgrade | file | |
BH23 | borehole | 46.80 | 4.130 | -27.44111823 | 153.0992543 | surveyed | 2005-02-18 | Gateway Bridge Du... | file | |
T-BH02 | borehole | 32.54 | 4.126 | -27.40548858 | 153.1654512 | GPS | 2016-09-21 | Port Drive Upgrade | file | |
PCP14 | CPT | 5.50 | 4.100 | -27.31206787 | 153.0390136 | unknown | 1994-01-27 | Gateway Arterial ... | file | |
CPTu173 | CPT | 11.35 | 4.100 | -27.43501231 | 153.0960976 | surveyed | 2005-02-04 | Gateway Upgrade N... | file | |
BH201 | borehole | 30.00 | 4.100 | -27.46997356 | 153.0173179 | estimated-rough | 2002-10-04 | Gallery of Modern... | file | |
BH112 | borehole | 14.50 | 4.100 | -27.48141962 | 153.0263693 | estimated-rough | 1999-03-19 | South Bank Footbr... | file | |
B29 | borehole | 41.00 | 4.100 | -27.43967566 | 153.0976699 | estimated-rough | 1981-01-17 | Gateway Bridge | file | |
G5 | borehole | 17.50 | 4.100 | -27.47885666 | 153.019851 | estimated-rough | 2005-06-02 | Southbank Educati... | file | |
BH16 | borehole | 12.94 | 4.090 | -27.09077749 | 152.97582518 | surveyed | 2005-11-22 | Widening of the C... | file | |
CPT208 | CPT | 27.51 | 4.080 | -16.8446002 | 145.6989024 | surveyed | 2015-06-04 | Smithfield Bypass | file |